Bandai Namco Time Crisis 5 Operation Manual page 52

Table of Contents

Advertisement

7. Operation
(3) LINK TEST
Item
(a) LINK AS
(b) LINK STATUS
(c) I/O PCB
(d) LINK STATUS
52
This screen is used to confirm the status of communication between the cabinets and between the
I/O PCBs.
1
In the I/O TEST screen, select LINK TEST using the Select switch and press the Enter switch.
The LINK TEST screen appears.
LINK TEST screen
Displays the CPU ID status.
Displays the communication status between the cabinets.
Displays the number of communication successes and failures.
Displays the transmitted data without modification.
Displays the PCB CHECK status.
Displays the number of communication successes and failures.
2
Press the Enter switch to return to the I/O TEST screen.
Description

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents