Bandai Namco Time Crisis 5 Operation Manual page 133

Table of Contents

Advertisement

5
Cut one cable tie using a utility knife. Remove the hexagon nut (M12) and remove the gun
tube from the vibration unit.
6
Remove the two flange socket (M3 x 6) and remove the cable cover (B).
Vibration unit
Cable tie
(cut using a utility knife)
Hexagon nut (M12)
7
To install, perform the procedure in reverse.
8
After replacing the gun tube, be sure to check the operations. (See P-49 "7-7-5 Input/Output
Test of Switches (I/O TEST)", P-47 "(1) SIGHT CALIBRATION (Gun Sight Calibration Screen)".)
● When installing, be sure to securely lock the connectors.
● When installing, take care not to allow the connectors and harnesses to get caught.
- Must be performed by a technician -
flange socket (M3 x 6)
Gun tube
8B. Service
flange socket (M3 x 6)
Cable cover (B)
133
1
2
3
4
5
6
7
8A
8B
9
10
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents