Bandai Namco Time Crisis 5 Operation Manual page 129

Table of Contents

Advertisement

8
Loosen the double point (M4 x 6), remove the crank, and replace the rotary solenoid.
Rotary solenoid
9
To install, perform the procedure in reverse.
10
After replacing the rotary solenoid, be sure to check the operations. (See P-49 "7-7-5 Input/
Output Test of Switches (I/O TEST)", P-47 "(1) SIGHT CALIBRATION (Gun Sight Calibration
Screen)".)
● When installing the rotary solenoid, align the flat surface of the rotary solenoid shaft with
the position of the double point.
Crank
● When installing, align the tip of the rotary solenoid shaft so that it is flush with the surface
of the crank.
● When installing, be sure to securely lock the connectors.
● When installing, take care not to allow the connectors and harnesses to get caught.
- Must be performed by a technician -
Allen key
Double point (M4 x 6)
Flush
Crank
Double point (M4 x 6)
* Apply screw locking agent.
Flat surface
of rotary solenoid
Rotary solenoid
Align the tip of the rotary solenoid shaft so that
it is flush with the surface of the crank.
Crank
8B. Service
1
2
3
4
5
6
7
8A
8B
9
10
11
129

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents