12
Pull the harnesses from the coin box assembly in the monitor tower (L) assembly through
the openings shown in the figure below and connect the five connectors.
Monitor tower (L) assembly side
(inside maintenance door)
13
Pull the harnesses from the coin box assembly into the monitor tower (R) assembly through
the openings shown in the figure below and connect the four connectors.
Opening
Connectors
Connector
Opening
Opening
Opening
Monitor tower (R) assembly side
(inside maintenance door)
8A. Service
- Must be performed by a technician -
Opening
Connectors
Connectors
1
2
3
4
5
6
7
8A
8B
9
10
11
69