Cross Shaft Assembly - Porsche 911 GT3 Cup 2018 Techical Manual

Table of Contents

Advertisement

2.9.18 Cross shaft assembly

In the first step, the four-point bearing must be centered in the housing lid. Housing lid
and four-point bearing are pre-assembled with an auxiliary shaft (tool no. 36) for that.
The four-point bearing is fixed in place with the locking ring. The cross shaft is inserted
in the housing lid in the second step.
Caution
Heat the housing lid (1) at 140 °C (284 F) for 30 minutes
Insert the cylinder roll bearing (2) in the housing with tool no. 7 (bearing label must face
toward the top)
Clamp tool no. 36 (auxiliary shaft) into the vice
Put the housing lid (1) on auxiliary shaft no. 36
Insert the bottom inner ring of the four-point bearing (3) in the housing lid
Insert the four-point bearing (3) (label toward the top)
Insert the top ring of the four-point bearing (3)
Lubricate and put on the nut (1)
Pre-tighten the shaft by tightening the nut (1)
Version: 4/20/2018
Hot components
Danger of burns
Wear personal protective equipment.
Powertrain
2.9.18.1
2.9.18.2
2.9.18.3
911 GT3 Cup (991 II)
MY 2018
137

Advertisement

Table of Contents
loading

Table of Contents