Gear Housing Pre-Assembly - Porsche 911 GT3 Cup 2018 Techical Manual

Table of Contents

Advertisement

Powertrain
2.9.2.1
911 GT3 Cup (991 II)
108

2.9.2 Gear housing pre-assembly

General
Before assembling the gear housing, all components must be cleaned and degreased
thoroughly. Furthermore, a visual inspection must be carried out. Especially all oil holes
must be checked to ensure the perfect running of the transmission. The gear housing
must finally be blown out with compressed air.
Caution
The studs must be cleaned thoroughly with petroleum benzine. After the studs are
inserted, the gear housing has to set in an oven for approx. 40 minutes at 130°C (266
F).
Screwing in the gear housing studs
Heat exchanger studs (green)
Dimensions:
Projection:
Adhesive:
Thread position:
MY 2018
Hot components
Danger of burns
Wear personal protective equipment.
M6x15
16 mm (0.63")
Loctite 2701 green
Screw in long thread
Version: 4/20/2018

Advertisement

Table of Contents
loading

Table of Contents