Powertrain
2.9.20.7
2.9.20.8
2.9.20.9
2.9.20.10
911 GT3 Cup (991 II)
150
Cover Installation opening Insert the coupling housing (arrow) with a greased O-ring
and fix it with a securing ring
Connect switch actuator (3) and tighten with 10 Nm
Connect switching actuator potentiometer (2) to switching actuator
Calibrate potentiometer operation (6th gear 4.5 V)
Gearbox holder to gearbox screw 45 Nm
Shift cylinder on gearbox holder and shift actuation screws 12 Nm
Install the hydraulic lines (4 and 6) of the central dumper.
MY 2018
Pay attention to the installation position of the shift
Information
cylinder on shifting operation (Fig. 2.9.20.9) The round
indentation on the shift cylinder points to the Rolex
shaft.
Version: 4/20/2018