Bodywork
4.15.3.5
4.15.3.6
4.15.3.7
4.15.3.8
911 GT3 Cup (991 II)
282
Installing the new part
Apply evenly two-component glue on the old bonded joints. The curing time of two-
component glue is 2-3 hours at 60 °C (140 °F)
The illustration shows the rivets (1) from the outside on the left. Place the new part,
fit the rivets and rivet them.
The illustration shows the rivets (1) from the inside on the right.
The illustration shows the rivets (1) from below on the right.
The illustration shows the rivets (1) on the rear engine mount on the left.
The curing time of two-component glue is 2-3 hours at 60 °C (140 °F).
MY 2018
Version: 4/20/2018