Cross Shaft Setup - Porsche 911 GT3 Cup 2018 Techical Manual

Table of Contents

Advertisement

Powertrain
2.9.17.1
911 GT3 Cup (991 II)
136

2.9.17 Cross shaft setup

Caution
Heat the cylinder roll bearing inner ring on a hot plate for 30 minutes at 130° C (266 F)
Lubricate the shaft
Press the heated bearing (1) quickly onto the shaft. It must be possible to mount the
bearing without applying great force.
Put the bushing on the shaft (2)
Put on the ring gear (3) (observe installation position)
MY 2018
Hot components
Danger of burns
Wear personal protective equipment.
Version: 4/20/2018

Advertisement

Table of Contents
loading

Table of Contents