Required personnel and equipment for appliance
hardware installation

Package contents

Required personnel and equipment for appliance hardware installation

Veritas Velocity 7330 Appliance hardware installation
Table 2-1
requirements (continued)
Step
Task
Step 3
Verify that all of the package contents are present. If any of the listed
items are not present, contact your vendor for assistance.
See
Step 4
Determine the rack locations for the appliance.
See
The following items are required at the installation site:
At least two people or a mechanical lift to move the storage shelves
A keyboard and a monitor to connect to the compute node for IPMI port
configuration
Ethernet cables to connect the compute node to your corporate network
A 19-inch rack with dual power distribution units (PDUs)
120VAC or 220VAC power supply for the compute node
220VAC power supply for the Primary Storage Shelf
The Velocity 7330 Appliance compute node and storage shelf are shipped in
separate containers that each contain the necessary installation equipment and
other materials. The disk drives for the storage shelves are shipped in additional
containers.
Table 2-2
lists the contents of the shipping containers. Verify that all of items are
present after you unpack each container.
"Package contents"
on page 22.
"Determining the rack location"
Preinstallation requirements
on page 23.