Turning On The Hardware And Verifying Operation - VERITAS 5150 Hardware Installation Manual

Hide thumbs Also See for 5150:
Table of Contents

Advertisement

Turning on the hardware and verifying operation

200 - 240 VAC at 50/60 Hz
2
For each device, obtain two power cords that are appropriate for your region
and equipment.
3
Connect one cable to one PDU strip.
4
Connect the other cable to the other PDU strip.
See
"Turning on the hardware and verifying operation"
To turn on the appliance
1
On the front, right, side of the appliance press the Power button.
2
Verify that the bottom LED in all the four disk drive slots are green.
The following table provides details of the disk drive LEDs.
LED
States
1-Status LED,
Off
Top
Solid amber
Blinking amber
2-Activity LED,
Off
Bottom
Solid green
Blinking green
Blinks green
occasionally
Turning on the hardware and verifying operation
on page 27.
Description
No fault
Disk fault
A RAID rebuild is in progress
Power is on and the disk has spun down
Power is on but there is no disk activity
Power is on and the disk is spinning up
Commands are being processed
Installation procedures
27

Advertisement

Table of Contents
loading

Table of Contents