Typical Vlan Application - Planet Networking & Communication WGSW-50040 Configuration Manual

50-port 10/100/1000mbps with 4 shared sfp managed gigabit switch
Table of Contents

Advertisement

10.1.3 Typical VLAN Application

Scenario:
VLAN2
PC
VLAN2
The existing LAN is required to be partitioned to 3 VLANs due to security and application requirements. The
three VLANs are VLAN2, VLAN100 and VLAN200. Those three VLANs are cross two different location A and
B. One switch is placed in each site, and cross-location requirement can be met if VLAN traffic can be
transferred between the two switches.
Configuration Item
VLAN2
VLAN100
VLAN200
Trunk port
Connect the Trunk ports of both switches for a Trunk link to convey the cross-switch VLAN traffic; connect all
network devices to the other ports of corresponding VLANs.
In this example, port 1 and port 12 is spared and can be used for management port or for other purposes.
The configuration steps are listed below:
Switch A:
Switch(config)#vlan 2
Switch(Config-Vlan2)#switchport interface ethernet 1/2-4
Switch(Config-Vlan2)#exit
Switch(config)#vlan 100
Switch(Config-Vlan100)#switchport interface ethernet 1/5-7
PC
Workstation
PC
PC
Workstation
Figure 10-2 Typical VLAN Application Topology
Configuration description
Site A and site B switch port 2 -4.
Site A and site B switch port 5 -7.
Site A and site B switch port 8 -10.
Site A and site B switch port 11.
VLAN100
Workstation
PC
Switch A
Trunk Link
Switch B
PC
VLAN100
Workstation
10-4
VLAN200
PC
PC
VLAN200

Advertisement

Table of Contents
loading

Table of Contents