Planet Networking & Communication WGSW-50040 Configuration Manual page 53

50-port 10/100/1000mbps with 4 shared sfp managed gigabit switch
Table of Contents

Advertisement

[Boot]
Step 4:
Enable FTP/TFTP server in the PC. For TFTP, run TFTP server program; for FTP, run FTP server program.
Before start downloading upgrade file to the switch, verify the connectivity between the server and the switch
by ping from the server. If ping succeeds, run "load" command in the BootROM mode from the switch; if it fails,
perform troubleshooting to find out the cause. The following is the configuration for the system update image
file.
[Boot]: load nos.img
Loading...
Loading file ok!
Step 5:
Execute "write nos.img" in BootROM mode. The following saves the system update image file.
[Boot]: write nos.img
File nos.img exists, overwrite? (Y/N)?[N] y
Writing nos.img.....................................................
Write nos.img OK.
[Boot]:
Step 6:
The following update file boot.rom, the basic environment is the same as Step 4.
[Boot]: load boot.room
Loading...
Loading file ok!
Step 7:
Execute "write boot.rom" in BootROM mode. The following saves the update file.
[Boot]: write boot.rom
File boot.rom exists, overwrite? (Y/N)?[N] y
Writing boot.rom.............................................
Write boot.rom OK.
[Boot]:
4-15

Advertisement

Table of Contents
loading

Table of Contents