Connecting A Netbackup 5330 Compute Node To A Primary Shelf - VERITAS NetBackup 5330 Appliance Hardware Installation Manual

Storage shelves and disk drives
Hide thumbs Also See for NetBackup 5330:
Table of Contents

Advertisement

Connecting a NetBackup 5330 compute node to
a Primary Shelf

Connecting a NetBackup 5330 compute node to a Primary Shelf

The cards in the PCIe risers include SFP transceivers with protective end caps.
The end caps need to be removed before a cable is inserted.
To remove an SFP end cap
1
Grasp the top and bottom of an end cap.
2
Pull the end cap straight back. Do not twist the end cap.
3
Keep the end caps in a dust-free location in case you need them at another
time.
The compute node ships with four, 1 meter, Fibre Channel (FC) cables. FC cables
connect the compute node to the Primary Shelf canisters. To ensure communication
redundancy, connect the units exactly as described in this topic.
Note: If you have a 6TB Primary Shelf, you must upgrade to NetBackup Appliance
Release 2.7.1, or later. Refer to the NetBackup Appliance Upgrade Guide for
Release 2.7.x - RedHat Enterprise Linux (RHEL) Operating System, which is located
at the following site. https://veritas.com/support/en_US/article.DOC2792.html
The following diagrams and tables show the locations of the FC ports on both
components.
Compute node FC ports
Table 3-1
Compute node FC ports
Slot 1; ports 1 and 2
Slot 4; ports 1 and 2
Slot 3
Slot 6
Slot 2
Slot 1
Slot 4
2 1
Hardware installation procedures
Slot 5
2 1
49

Advertisement

Table of Contents
loading

Table of Contents