VERITAS NetBackup 5330 Appliance Hardware Installation Manual page 72

Storage shelves and disk drives
Hide thumbs Also See for NetBackup 5330:
Table of Contents

Advertisement

72
Hardware installation procedures
Turning on the hardware and verifying operation
6
On the rear of the Primary Shelf, turn on both power switches.
7
Verify that the left-most LEDs on both power canisters are green.

Advertisement

Table of Contents
loading

Table of Contents