Performing a soft shutdown before adding a new Expansion Shelf

Performing a soft shutdown before adding a new
Expansion Shelf
4
Turn on both power switches.
5
Wait for the 00 display on the Expansion Shelf.
Refer to the following sections as needed.
Turn on the devices and verify operations.
See "Turning on the hardware and verifying operation" on page 68.
Add the new disk space from the Expansion Shelves.
See "Adding the disk space of an Expansion Storage Shelf from the NetBackup
Appliance Web Console" on page 85.
See "Adding the disk space of an Expansion Storage Shelf from the NetBackup
Appliance Shell Menu" on page 87.
Best practices recommend that the compute node is turned off before you install
and connect a second Expansion Shelf. A soft shutdown preserves data and
functionality of the compute node. The addition of a new Expansion Shelf to an
operating compute node can cause the Primary Shelf to shutdown unless the soft
shutdown procedure is performed. After the compute node is shut down, the Primary
Shelf is also shut down.
Warning: You should never perform a hard shutdown by using the power button
to turn off the NetBackup Appliance. Using the power button to turn off the
NetBackup Appliance can cause data corruption to occur.