Connecting the 3U16 storage shelf and appliance
power cords
Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
To connect additional 3U16 storage shelves
1
Locate the two SAS2 cables that are shipped with the 3U16 storage shelf.
2
Locate the SAS_IN and SAS_OUT ports on both I/O modules on the rear of
the storage shelf.
3
Locate the left I/O module of the 3U16 storage shelf that is connected to the
appliance.
4
Plug one end of a SAS2 cable into the SAS_OUT port in that I/O module.
5
Connect the other end of the SAS2 cable to the SAS_IN port in the left I/O
module in the additional storage shelf.
6
Plug one end of another SAS2 cable into the SAS_OUT port in the right I/O
module of the storage shelf that is connected to the appliance.
7
Connect the other end of the SAS2 cable to the SAS_IN port in the right I/O
module in the additional storage shelf.
Each appliance and each storage shelf contain two AC power supplies. To ensure
power redundancy, connect the power supplies on each component to separate
AC power sources.

Connecting the 3U16 storage shelf and appliance power cords