11
On the front right panel of the compute node, press the power button to turn
on the compute node.
12
After a few minutes, verify that the compute node has fully initialized as follows:
On the right front panel of the compute node, locate the triangular Status
■
LED near the top of the LED panel. The LED should be green during normal
operations.
Verify that the disk drive LEDs have initialized properly as follows:
■
The Status LED (1) should not be lit. The following indications are also
possible:
A solid, amber, LED indicates a disk fault.
■
Hardware installation procedures
Turning on the hardware and verifying operation
75