Verify that the Power LED on the front, left, of the shelf is green.
9
After approximately 5 to 10 minutes, verify that the shelf has fully initialized as
follows:
The 12 disk LEDs on the front of each drawer are green.
The blue Service Action Allowed LED is not lit.
Turning on the hardware and verifying operation
Power
Standby power
Locate
Temperature
Service action
required
Hardware installation procedures
73