70
Hardware installation procedures
Turning on the hardware and verifying operation
4
Verify that the Power LED on the front, left, of the shelf is green.
5
After approximately 5 to 10 minutes, verify that the shelf has fully initialized as
follows:
The 12 disk LEDs on the front of each drawer are green.
■
The blue Service Action Allowed LED is not lit.
■
Power
Standby power
Locate
Temperature
Service action
required