Power Cut Restart Waiting Time - Veichi Electric AC60 series Manual

Table of Contents

Advertisement

In the exterior terminal control state, if power cut, after electrify, the
control command of the exterior terminal (FWD/REV)is invalid; The control
command is valid only when the running order reset operation on the exterior
terminal is detected.
Must after detecting the operation of the exterior control terminal has
reset running command, then the control command is valid.
1. Valid
If the frequency inverter is at the running state before power cut,
after power on, frequency inverter will automatically start by the speed
track to start mode after setting waiting time(set by the [E-32]). During
the waiting time between power off and restart, frequency inverter will
not accept any operation order, but if input the stop order in this period,
frequency inverter will out of the speed track to restart mode.
Attention: the power cut restart function enables the frequency inverter
automatic start operation after power on. Therefore there is huge
contingency, please be cautious to use this function for the sake of
person and equipment safety.
Tips: in the exterior terminal control state, if use the keyboard STOP/SESET
key to stop, the control order of exterior terminal (FWD/REV) is invalid.
Even permit that power cut restart function is valid, the control
command is valid only after the running order reset operation on
exterior terminal is detected.

Power cut restart waiting time:

frequency inverter power on, it will start to run while the [E-32]setting
time passed.
The principles of this time setting is base on the factors such as the work
resume preparation time of equipments which correlate with the frequency
inverter after power supply restore.
When the [E-31]setting is valid ,after
85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents