Installation Environmental Requirements; Charter Three Installation - Veichi Electric AC60 series Manual

Table of Contents

Advertisement

Charter three Installation

3.1 Installation environmental requirements

1.Ambient temperature: -10℃~40℃, good ventilation and heat dissipation. If
the temperature is higher than 40 ℃. The frequency inverter should be
derated to use.
2. Avoid vibration, free of direct sunlight and away from heat sources.
3. Inverter installed under the altitude of 1000m can output rated power. It
needs be derated to use when the altitude is more than 1,000 m . Pls refer
specific figures as below :
4. Humidity should be lower than 90% (no condensation); Avoid high temperature
and high humidity.
5. Be away from oil, salt and corrosive gases.
6. Prevent inverter from intrusion of water drop, steam, dust, wooland metal
dust.
7. Prevent electromagnetic interference, away from sources of interference.
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents