Warm-Up Time; Connect To The Device Under Test (Dut); Figure ‎ 3 -3 Connect To Dut - Cubicon Lux User Manual

Table of Contents

Advertisement

3.4 Warm‐up Time
3.5 Connect to the Device Under Test
(DUT)
Figure ‎ 3 -3
WARNING
LCR-6000 Series is ready to be used as soon as the
power-up sequence has completed. However, to achieve
the specification accuracy, first warm up the instrument
for 30 minutes.
The LCR-6000 Series uses a four terminal measurement
configuration that provides easy, accurate and stable
measurements and avoids mutual inductance, interference
from measurement signals, noise and other factors
inherent with other types of connections.
Connect to DUT
L Force
L Sense
-
Do not apply DC voltage or current to the
UNKNOWN terminals. Applying a DC voltage or
current may lead to device failure. Connect the
measurement sample (DUT) to the test port (or
the test fixture, cables, etc. after the DUT has
been completely discharged.
LCR-6000 Series User Manual
H Sense
- DUT +
+
H Force
23

Advertisement

Table of Contents
loading

Table of Contents