Mitsubishi Electric Q80BD-J71GP21-SX User Manual page 75

Network melsec series/cc-link ie controller
Table of Contents

Advertisement

5
PROCEDURES AND SETTINGS BEFORE OPERATION
(b) Setting the target station
(5) Starting the test
Clicking the
utility displays the following confirmation dialog box.
Clicking the
(6) Checking the test result
The result is displayed on Test result field of the "Board detail information" screen.
If the test completes abnormally, the cable used for the station-to-station test is faulty.
Replace the cable.
In the network parameter of GX Works2, set the mode to Online.
*1: If the CC-Link IE Controller Network board is the target station, set as follows on the "Parameter
setting" screen of the CC IE Control utility.
Network type: CC IE Control (Normal station)
Mode: Online
Station No.: Station number for the target station
button on the "Parameter setting" screen of the CC IE Control
END
button executes the station-to-station test.
Yes
<Normal executing >
If the above display remains
for about 10 seconds, the result is
normal.
*1
<Abnormal completion>
5.5 Test
5.5.5 Station-to-station test
1
2
3
4
5
6
7
8
5
- 26

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q80bd-j71gp21s-sxQ81bd-j71gp21-sxQ81bd-j71gp21s-sx

Table of Contents