Mitsubishi Electric Q80BD-J71GP21-SX User Manual page 54

Network melsec series/cc-link ie controller
Table of Contents

Advertisement

5
PROCEDURES AND SETTINGS BEFORE OPERATION
No.
Name
1)
Indicator LED
Optical fiber cable
2)
connector
External power supply
3)
LED
External power supply
4)
cable connector
5
- 5
5.2 Part Names and Settings
Indicates the operating status of the CC-Link IE Controller Network board.
(1) in this section
Connector for connecting optical fiber cable
The cable terminal is as shown below.
For wiring of an optical fiber cable, refer to the following section.
Section 5.4 Wiring
Indicates the status of external power supply.
(2) in this section
Connector for connecting external power supply cable
The cable terminal is as shown below.
Description
IN Reverse loop transmission
IN Forward loop reception
OUT Forward loop transmission
OUT Reverse loop reception
(Board top)
24V
24G
E.PW

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q80bd-j71gp21s-sxQ81bd-j71gp21-sxQ81bd-j71gp21s-sx

Table of Contents