Sign In
Upload
Manuals
Brands
Mitsubishi Electric Manuals
Computer Hardware
Q80BD-J61BT11N
Mitsubishi Electric Q80BD-J61BT11N Manuals
Manuals and User Guides for Mitsubishi Electric Q80BD-J61BT11N. We have
1
Mitsubishi Electric Q80BD-J61BT11N manual available for free PDF download: User Manual
Mitsubishi Electric Q80BD-J61BT11N User Manual (362 pages)
Network Interface Board MELSEC CC-Link System Master/Local Interface Board
Brand:
Mitsubishi Electric
| Category:
Computer Hardware
| Size: 8.2 MB
Table of Contents
Safety Precautions
3
Installation Precautions
4
Wiring Precautions
5
Conditions of Use for the Product
7
Revisions
8
Precautions for Use
8
Table of Contents
14
Manuals
21
How to Use this Manual
22
Generic Terms and Abbreviations
23
Packing List
24
1 Overview
25
Features of the CC-Link Ver.2 Board
26
Features of the CC-Link System
27
2 System Configuration
35
System Configuration Using CC-Link Ver.2 Board
35
Notes on the System Configuration
36
Operating Environment
38
3 Specifications
43
General Specifications
43
Performance Specifications
44
Maximum Number of Connected Modules
46
Maximum Overall Cable Distance (for Ver.1.00)
48
Maximum Overall Cable Distance (for Ver.1.10)
50
CC-Link Dedicated Cable Specifications
50
Buffer Memory List
51
4 Functions
55
Function List
55
Basic Functions
57
Communication with Remote I/O Stations
57
Communication with the Remote Device Stations
59
Communication with the Local Stations
64
Communication with the Intelligent Device Station
70
Functions for Improving System Reliability
76
Disconnecting a Data Link Faulty Station and Continuing the Data Link with Only Normal Stations (Slave Station Disconnect Function)
76
Automatically Reconnecting a Disconnected Data Link Faulty Station When It Returns to Normal (Auto Return Function)
77
Retaining the Device Status of a Data Link Faulty Station (Setting the Input Data Status from a Data Link Faulty Station)
78
Continuing the Data Link Even When the Master Station Is Faulty (Standby Master Function)
79
Monitoring the Operation of the Software (Operating System, Driver) Inside the Hardware (Driver WDT Function)
89
Station-Based Block Data Assurance Function
90
Useful Functions
94
Creating a Program that Contains Modules to be Added in the Future (Reserved Station Function)
94
Powering off a Station in Operation Without Detecting an Error (Error Invalid Station Setting Function)
95
Checking Operations for each Station (Data Link Stop/Restart)
96
Station Number Duplicate Check
96
Multiple CPU System Support
97
Reducing the Reserved Points of the Remote I/O Stations (Remote I/O Station Points Setting)
98
Increasing the Number of Cyclic Points (Remote Net Ver.2 Mode, Remote Net Additional Mode)
99
Transient Transmission Functions
108
Performing Transient Transmission (Functions)
108
5 Procedure before Starting the Data Link
109
Procedures before Operating the CC-Link Ver.2 Board
109
Component Names and Settings
110
Installation
112
Precautions on Handling the CC-Link Ver.2 Board
112
Installation Environment
112
Board Installation
113
Setting Channel Numbers
114
Wiring
115
Preparation before Wiring
115
Terminal Block
116
Wiring Procedure
118
T-Branch Connection
120
Station Number Setting
122
Transmission Rate and Mode Settings
123
Test
123
6 Parameter Settings
125
Parameter Setting Items
125
Parameter Setting Examples (Remote Net Ver.1 Mode)
129
Master Station Network Parameter Settings
129
Local Station Network Parameter Settings
130
Parameter Setting Examples (Remote Net Ver.2 Mode)
131
Master Station Network Parameter Settings
131
Local Station Network Parameter Settings
132
Parameter Setting Examples (Remote Net Additional Mode)
133
Master Station Network Parameter Settings
133
Local Station Network Parameter Settings
134
Status Difference between a Master Station and a Slave Station at an Error
135
7 Installing and Uninstalling the Software Package
137
Installation and Uninstallation Precautions
137
Installation
138
Uninstallation
140
8 Operating the Utility Software
141
Starting and Ending Utility
141
Starting a Utility
141
Ending a Utility
142
CC-Link Ver.2 Utility
143
Screen Configuration and Basic Operations
143
Operating the Board Information Screen
144
Operating the Other Station Monitor Screen
147
Operating the Online Operation Screen
149
Operating the Parameter Settings Screen
150
Operating the Target Settings Screen
152
Operating the Memory I/O Test Screen
153
Operating the Test Screen
154
Device Monitor Utility
158
9 Melsec Data Link Library
159
10 Communication between the Master Station and Remote I/O Stations
161
Configuring a System
161
Setting up the Master Station
162
Switch Setting (Channel No. Setting)
162
Parameter Settings
163
Setting up the Remote I/O Stations
164
Creating a Program
165
Executing the Data Link
166
Checking the Data Link Status
166
Checking the Master Station
166
Checking Remote I/O Stations
167
Confirming the Operation with a User Program
168
Setting the Master Station
170
Switch Setting (Channel No. Setting)
170
Parameter Settings
171
Creating a Program
173
Executing the Data Link
175
Checking the Data Link Status
175
Confirming the Operation with a User Program
177
Setting the Master Station
179
Switch Setting (Channel No. Setting)
179
Parameter Settings
180
Setting up the Intelligent Device Station (AJ65BT-D75P2-S3)
204
Creating a Program
205
Communication between the Master Station and Intelligent Device Station (Aj65Bt-D75P2-S3)
213
Initial Setting
217
Zero Point Return Control
219
Positioning Control
221
JOG Operation Control
223
Executing the Data Link
225
Checking the Data Link Status
225
Confirming the Operation with a User Program
227
Error Code
229
Troubleshooting
235
Verification of Problem Occurrence
236
Troubleshooting for Installation and Uninstallation
238
Installation Failed
238
Uninstallation Failed
238
When the Instruction Displayed on the Screen Is Not Effective at Installation
240
When the Driver Is Not Installed
241
Troubleshooting When Personal Computer Cannot be Startup or System down Occurred
243
Checking Personal Computer and Operating System
243
Checking on Event Viewer Screen
245
Checking on Device Manager Screen
247
Board WDT Error
248
Driver WDT Error
248
When the RUN LED on the CC-Link Ver.2 Board Is Flashing
249
CC-Link System Troubleshooting
250
Verification of Problem Occurrence
250
Troubleshooting Flow When the "ERR." LED on the Master Station Is Flashing
257
Measures for Slow Personal Computer Operation
261
Information Required for Inquiries
262
Appendix
263
Appendix 1 Buffer Memory Details
263
Appendix 2 Link Special Relays (SB) and Link Special Registers (SW)
279
Appendix 2.1 List of Link Special Relays (Sbs)
279
Appendix 2.2 List of Link Special Registers (Sws)
284
Appendix 3 Data Link Processing Time
292
Appendix 3.1 Link Scan Time
292
Appendix 3.2 Cyclic Transmission Processing Time
294
Appendix 3.3 Transient Transmission Processing Time
306
Appendix 4 Communication with the Redundant CPU
309
Appendix 5 Comparisons with CC-Link Ver.1 Board and CC-Link Module
312
Appendix 5.1 Differences from the CC-Link Ver.1 Board
312
Appendix 5.2 Functional Comparisons with CC-Link Module
314
Appendix 6 Replacing the CC-Link Board
315
Appendix 6.1 Replacing a CC-Link Ver.1 Board with a CC-Link Ver.2 Board
315
Appendix 6.2 Replacing a CC-Link Ver.2 Board with a CC-Link Ver.1 Board, or a CC-Link Board with Another of the same Version
316
Appendix 6.3 Precautions
317
Appendix 7 about "Parameter Backup/Restore Tool
318
Appendix 7.1 Operation Procedure
318
Appendix 7.1.1 Starting and Exiting the Tool
318
Appendix 7.1.2 Backing up Parameters
319
Appendix 7.1.3 Restoring Parameters
320
Appendix 7.1.4 How to Check the Version
322
Appendix 7.2 Precautions When Using "Parameter Backup/Restoration Tool
323
Appendix 8 Setting Checklists
324
Appendix 8.1 Parameter Setting Checklist
324
Appendix 8.2 Station Information Setting Checklist
325
Appendix 8.3 Device Assignment Checklist
327
Appendix 9 Combinations with Existing Software
329
Appendix 10 Checking Serial Number and Function Version
330
Appendix 11 CC-Link Version
332
Appendix 12 Mode Selection Method
333
Appendix 13 New and Improved Functions
334
Appendix 13.1 Change of Hardware Function
334
Appendix 13.2 Update of Software Package
334
Appendix 14 Restrictions for Operating System
335
Appendix 15 Warning Message Appears on Windows
336
Appendix 15.1 Overview of Warning Message
336
Appendix 15.2 Methods for Preventing the Warning Message
337
Appendix 16 Behavior When Personal Computer Enters Power Save Mode or Fast Startup
342
(Hibernate, Sleep)
342
Appendix 16.2 Behavior When the Fast Startup Function Is Enabled
343
Appendix 17 Melsecpowermanager
344
Appendix 17.1 Installing Melsecpowermanager
344
Appendix 17.2 Uninstalling Melsecpowermanager
344
Appendix 17.3 Checking Melsecpowermanager
345
Appendix 18 EMC and Low Voltage Directive
347
Appendix 18.1 Requirements for Conformance to EMC Directive
347
Appendix 18.2 Requirements for Conformance to Low Voltage Directive
352
Appendix 19 External Dimensions
353
Appendix 19.1 Q80BD-J61BT11N
353
Appendix 19.2 Q81BD-J61BT11
354
Advertisement
Advertisement
Related Products
Mitsubishi Electric Q80BD-J71GP21-SX
Mitsubishi Electric Q80BD-J71GP21S-SX
Mitsubishi Electric Q80BD-J71LP21-25
Mitsubishi Electric Q80BD-J71LP21S-25
Mitsubishi Electric Q80BD-J71LP21G
Mitsubishi Electric Q80BD-J71BR11
Mitsubishi Electric MELSEC Q80BD-J71GF11-T2
Mitsubishi Electric Q81BD-J71GP21-SX
Mitsubishi Electric Q81BD-J71GP21S-SX
Mitsubishi Electric Q81BD-J71LP21-25
Mitsubishi Electric Categories
Air Conditioner
Controller
Projector
Inverter
Heat Pump
More Mitsubishi Electric Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL