Mitsubishi Electric Q80BD-J71GP21-SX User Manual page 63

Network melsec series/cc-link ie controller
Table of Contents

Advertisement

5
PROCEDURES AND SETTINGS BEFORE OPERATION
(2) Cable connection
(a) Connection method
Control station
Station number 1
Personal
computer
CC-Link IE
Controller
Network
board
IN
OUT
(b) Connecting the optical fiber cable
Connection
Power OFF the personal computer.
Connect the cable-side connector to the
board-side one, paying attention to the
orientation. Push it until a "click" can be
heard.
Lightly pull it to check that it is securely
connected.
End
(c) Disconnecting the optical fiber cable
Disconnection
Power OFF the personal computer.
Press the connector hook to disconnect the
cable.
End
Connect an optical fiber cable between OUT and IN as shown below.
Note that there is no need to connect the cables in the order of station numbers.
Normal station
CC-Link IE
Controller
Station number 2
Network
module
QCPU
IN
OUT
The following shows the method for connecting the optical fiber cable.
The following shows the method for disconnecting the optical fiber cable.
Normal station
CC-Link IE
Controller
Station number n
n 120
<
Network
module
QCPU
IN
OUT
CC-Link IE Controller Network board
Board-side
connector
Cable-side
connector
Connector
hook
CC-Link IE Controller Network board
Board-side
connector
Cable-side
connector
Connector
hook
5.4 Wiring
5.4.1 Controller network system
1
2
3
4
5
6
7
8
5
- 14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q80bd-j71gp21s-sxQ81bd-j71gp21-sxQ81bd-j71gp21s-sx

Table of Contents