Toyota 3VZ–FE Troubleshooting Manual page 527

Table of Contents

Advertisement

CHARGING SYSTEM
GENERATOR
3.
INSTALL NO.2 AND NO.3 RH ENGINE MOUNTING STAYS
(a) Install the No.2 RH engine mounting stay with the bolt and
nut.
Bolt
Torque: 75 N m (760 kgf cm, 55 ft lbf)
Nut
Torque: 62 N m (630 kgf cm, 46 ft lbf)
(b) Install the No.3 RH engine mounting stay with the two bolts.
Torque: 73 N m (740 kgf cm, 54 ft lbf)
4.
CONNECT CABLE TO NEGATIVE TERMINAL OF
BATTERY
5.
PERFORM ON–VEHICLE INSPECTION
(See page CH–5)
CH–21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents