Connecting Cables
Perform the following tasks to connect and configure the network and serial ports
before you apply power to the server.
Step
Description
1.
Plan and configure server connections.
2.
(Optional) Review connector descriptions
and pinouts.
Related Information
"Understanding the Server" on page 1
■
"Confirming Server and Site Specifications" on page 9
■
"Preparing for Installation" on page 19
■
"Installing the Server in a 4-Post Rack" on page 27
■
"Installing the Server in a 2-Post Rack" on page 51
■
"Powering On the Server the First Time" on page 91
■
Links
"Connecting Data and Management
Cables" on page 78
"Identifying Ports" on page 82
77
Need help?
Do you have a question about the Netra Server X3-2 and is the answer not in the manual?
Questions and answers