Connecting the Server Cables

These tasks describe how to connect and configure the network and serial ports before you
attempt to boot the server.
Step
Description
1.
Review the cabling requirements.
2.
Review the front and rear panel connectors and ports.
3.
Connect the management and data cables.
4.
Secure the cables to the CMA.
Related Information
"Rear Panel Components (Installation)" on page 13
"Installing the Server" on page 23
"Powering On the Server for the First Time" on page 53

Cabling Requirements

Prior to cabling and powering-on the server, gather the following network information:
Netmask
IP address for the SP
Gateway IP address
At a minimum, you must connect cables to these ports before powering-on the server for the
first time:
SP SER MGT port
Links
"Cabling Requirements" on page 41
"Front Panel Components (Installation)" on page 12
"Rear Panel Components (Installation)" on page 13
"Identifying Ports" on page 42
"Connecting Data and Management Cables" on page 48
"Secure Cables to the CMA" on page 52
"Verify Operation of Slide Rails and CMA" on page 39
Connecting the Server Cables
41

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T7-2 and is the answer not in the manual?

Questions and answers

Table of Contents