Connecting Cables; Cabling Requirements - Oracle SPARC T7-1 Installation Manual

Hide thumbs Also See for SPARC T7-1:
Table of Contents

Advertisement

Connecting Cables

These tasks describe how to connect cables before you attempt to boot the server.
Step
Description
1.
Review the cabling requirements.
2.
Review the front and rear panel connectors and ports.
3.
Connect the management and data cables.
4.
Secure the cables to the CMA.
Related Information
"Rear Panel Components (Installation)" on page 13
"Installing the Server" on page 25
"Powering On the Server for the First Time" on page 65

Cabling Requirements

Prior to cabling and powering on the server, gather the following network information:
Netmask
IP address for the SP
Gateway IP address
At a minimum, you must connect cables to these ports before powering-on the server for the
first time:
Links
"Cabling Requirements" on page 51
"Front Panel Components (Installation)" on page 12
"Rear Panel Components (Installation)" on page 13
"Identifying Ports" on page 52
"Connecting Data and Management Cables" on page 58
"Secure Cables to the CMA" on page 62
"Verify Operation of Slide Rails and CMA" on page 47
Connecting Cables
51