Orienting And Securing The Robot Cage - ABB IRB 360/3 Product Manual

Parallel robot
Table of Contents

Advertisement

2 Installation and Commissioning

2.4.4. Orienting and securing the robot cage

2.4.4. Orienting and securing the robot cage

General
This section details how to orient and secure the robot cage at a horizontal level at the
installation site in order to run the robot safely.
WARNING!
Make sure that the robot cage is secured before mounting the robot.
Illustration
xx0700000469
A
B
C
Required equipment and references
Equipment
Spirit level
Shim
44
Spirit level
Chemical or Mechanical Expander bolts
Shim
Spare/ Part No.
Note
Shim Drawing on page 45
Continues on next page
3HAC030005-001 Revision: -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 360Irb 360/1 - 800

Table of Contents