Chapter 3: Preparing For Installation; In This Chapter; Installation Overview; Introduction - Avaya CallPilot 1005r Hardware Installation

Hide thumbs Also See for CallPilot 1005r:
Table of Contents

Advertisement

Chapter 3: Preparing for installation

In this chapter

Installation overview

Unpacking the 1005r server
Removing the front bezel
Installation overview

Introduction

This section provides an overview of the steps required to install the 1005r server and
peripheral devices.

Installation checklist

The following checklist identifies the tasks that must be performed when installing the Avaya
®
CallPilot
server. For detailed instructions, see
are finished with the installation, continue with the Installation and Configuration Task List
(NN44200-306).
Note:
If you are installing a High Availability system, follow this checklist for each server, with the
exceptions listed on
Avaya CallPilot® 1005r Server Hardware Installation
on page 25
on page 28
on page 29
Installing a High Availability system
Installing the server
on page 31 When you
on page 32
December 2010
25

Advertisement

Table of Contents
loading

Table of Contents