Avaya 1000M Installation And Commissioning Manual page 431

Communication server
Hide thumbs Also See for 1000M:
Table of Contents

Advertisement

F
field wiring kits and terminals
PDU connections, 125
floor drilling for anchor bolts, 331
floor plans, 66
fourth modules, 69
G
gaskets
bracing rod installation, 340
spacer kits, 76
GFCI (ground fault circuit interrupt) devices, 85
global PDU, 98
grills, 67
ground/protective earth
AC power, 86, 90
DC power, 113, 127
UPS, 93
ground start feature, 153
I
IG (isolated ground) bus, 86
IG-L6-30 receptacles, 85
installing
QUA6 PFTU (UK), 154
insulated ground wire, 128
I/O panels
backplane connections, 246, 247
IPE module connections, 249
superloop cabling, 385, 387, 388
system terminal connections, 175
IPE modules
backplane slots, 142
cable connections, 245, 249
line pair-termination tables, 251
placement, 58
superloop cabling, 380, 384
trunk pair-termination tables, 251, 253
Index
K
Krone cross connect system (UK), 142
L
L6-20 receptacles, 85
L6-30 receptacles, 85
labels
Krone cross connect system, 144
ladder racks, 81
LD 37 program
module additions, 349, 352, 354, 357, 358, 366
system terminal tests, 324
LED (light-emitting diodes)
blower unit acceptance tests, 321
power supply acceptance tests, 320
sysload acceptance tests, 323
leveling
earthquake bracing, 341
equipment, 75
lines
cabling, 245
connecting, 250
pair-termination tables, 250
terminal numbers, 250
line transfer switches, 325
locking latches, 67
logic return wiring
AC power, 86, 90
DC power, 113
LRE (logic return equalizers), 87, 92
M
master switch settings, system monitor, 158
MDF (modular distribution frames), 137
backplane cable expansion, 142
I/O panel connections, 247
PFTU cross-connections, 152
PFTU terminations, 150
system monitor cabling, 165
Large System Installation and Commissioning
Page 431 of 436

Advertisement

Table of Contents
loading

Table of Contents