Avaya 1000M Installation And Commissioning Manual page 316

Communication server
Hide thumbs Also See for 1000M:
Table of Contents

Advertisement

Page 316 of 436
Switch call processing
NN43021-310
Standard 06.01
Powering up the system and initial loading
7
Test the clocks:
a.
Verify that the clock controller is assigned to the active Core:
LD 60
SSCK x
SWCK
****
8
Verify that the Clock Controllers are switching correctly:
SWCK
SWCK
9
Check applications.
10 Check dial tone.
Procedure 50
Switching call processing
LD 135
SCPU
Core/Net 0 is now the active call processor.
March 2013
Load program
Get status of the clock controllers (x is "0" or "1"
for Clock 0 or Clock 1)
Switch the Clock (if necessary)
Exit program
Switch Clock
(Wait 30 seconds)
Switch Clock again
End of Procedure
Load program
Switch call processing from Core/Net 1 to Core/Net 0
End of Procedure

Advertisement

Table of Contents
loading

Table of Contents