Powering up the system and initial loading
a.
Perform a visual check of the LCDs.
b.
Test LCDs:
LD 135
TEST LCDs
DSPL ALL
3
Test the System Utility cards and the cCNI cards:
LD 135
STAT SUTL
TEST SUTL
STAT CNI c s
TEST CNI c s
4
Test system redundancy:
LD 137
TEST RDUN
DATA RDUN
STAT FMD
STAT RMD
5
Install the two system monitors. Test that the system monitors are
working:
LD 37
ENL TTY x
STAT XSM
****
6
Clear the display and minor alarms on both Cores:
LD 135
CDSP
CMAJ
CMIN ALL
Load program
Test LCDs
Load program
Get the status of the System Utility card
Test the System Utility card
Get status of cCNI cards (core, slot)
Test cCNI (core, slot)
Load program
Test redundancy
Test database integrity
Status of one or both Fixed Media Devices
(FMD)
Status of one or both Removable Media Devices
(RMD)
Load program
Enable the XMS, where x= system XMS
Check the system monitors
Exit program
Load program
Clear displays on the cores
Clear major alarms
Clear minor alarms
Large System Installation and Commissioning