Assembly - Yamaha RS90GTZ Service Manual

Hide thumbs Also See for RS90GTZ:
Table of Contents

Advertisement

PRIMARY SHEAVE AND DRIVE V-BELT
TIP
When replacing the weight and roller bushings,
use the 8 mm clutch bushing jig (clutch bush-
ing jig kit).
8 mm clutch bushing jig:
YS-39752
Clutch bushing jig kit:
90890-01528
Removing
Installing

ASSEMBLY

1. Install:
• Sliding sheave
(onto the spider)
TIP
Be sure the sliding sheave match mark (X) is
aligned with the spider match mark (X).
2. Install:
• Fixed sheave
(onto the spider)
TIP
• Clean the threads.
®
• Apply LOCTITE
shown.
NOTICE
®
LOCTITE
should be applied only to the
specified area. Never apply it to the bush-
ings and other areas.
16 mm (0.63 in)
30 mm (1.18 in)
4-8
POWR
TR
#648 to the fixed sheave as

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs90ltgtzRst90gtz

Table of Contents