Removing the shipping and handling indicators prior to commissioning
CAUTION
The shipping and handling indicators must be removed before commissioning the
converter.
If this is not observed, the transport indicators can cause damage in the unit when the
converter is operated.
Ethyl alcohol can be used to remove any remains of adhesive after removing the transport
indicators from the control cabinet.
3.3.2.4
Unpacking the cabinets
The packaging material must be discarded in accordance with the applicable country-specific
guidelines and rules.
3.3.2.5
Tools required
To install the connections, you will need:
● Spanner or socket spanner (width across flats 10)
● Spanner or socket spanner (width across flats 13)
● Spanner or socket spanner (width across flats 16/17)
● Spanner or socket spanner (width across flats 18/19)
● Hexagon-socket spanner (size 8)
● Torque wrench up to 50 Nm
● Screwdriver (size 2)
● Screwdriver Torx T20
● Screwdriver Torx T30
A socket-spanner case with two long extensions is recommended.
Cabinet Modules
Manual, (GH5), 05/2010, A5E03263538A
Mechanical installation
3.3 Installation
49