The cabinet units are installed in accordance with the dimension drawings supplied. The
clearance to be maintained between the top of the cabinet and the ceiling is shown in the
diagram below. Additional dimensions must be taken into account for the M06 (cabinet base)
and M07 (cable-marshaling compartment) options.
Figure 3-1
Note
Further dimensions can be found in the relevant dimension drawings on the customer DVD
supplied with the device.
The cooling air for the power unit is drawn in from the front through the ventilation grilles in
the lower part of the cabinet doors. The warmed air is discharged through the perforated top
cover or the ventilation grilles in the hood (with options M23/M43/M54 for degrees of
protection IP23/IP43/IP54). Cooling air can also be supplied from below through raised floors
or air ducts, for example. To allow this, you have to create openings in the sectioned base
plate.
In a residential environment this product can cause high-frequency disturbances, which
may make interference-suppression measures necessary.
Cabinet Modules
Manual, (GH5), 05/2010, A5E03263538A
Required room height for different degrees of protection
WARNING
Mechanical installation
3.3 Installation
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents