Maintenance And Servicing; Chapter Content - Siemens SINAMICS S120 Manual

Modular motion control drive
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Maintenance and servicing

6.1

Chapter content

This chapter provides information on the following:
● Maintenance and servicing procedures that have to be carried out on a regular basis to
● Replacing device components when the unit is serviced
● Reforming the DC link capacitors
Before carrying out maintenance or repair work on the de-energized cabinet, wait for 5
minutes after switching off the power supply. This allows the capacitors to discharge to a
harmless level (< 25 V) after the line voltage has been switched off.
Before starting work, you should also measure the DC link voltage after the 5 minutes have
elapsed. The voltage can be measured on DC link terminals DCP and DCN.
When the external power supply (e.g. option L55) or the external 230 V auxiliary infeed or
supply infeed is connected, dangerous voltages are still present in the cabinet even when
the main breaker is open.
Beware of any residual rotation of the fan.
Cabinet Modules
Manual, (GH5), 05/2010, A5E03263538A
ensure the availability of the components
DANGER
6
241

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents