4.4.11.5
Cable routing for Active Line Modules
For the Active Line Modules, the customer must carry out the following cabling or connection
work:
Table 4- 16
Cable routing
PROFIBUS cables to the Control Unit
DRIVE-CLiQ connections / signal cables to the Control Unit
Signal cables to the customer terminal block –X55
Notice:
The "Basic rules for cable routing" and "Preparatory steps" described above must
be observed whenever any cabling or connection work is performed!
Cabinet Modules
Manual, (GH5), 05/2010, A5E03263538A
Checklist for cabling or connection work for Active Line Modules
Electrical installation
4.4 Connections
Completed?
101