Electrical installation
4.4 Connections
Cable routing to terminal block -X2
Central Braking
1. Feed the cable into the cabinet from the bottom left.
2. Guide the cable up and, when it reaches the level of terminal -X2, guide it to the right.
3. Continue to feed the cable upwards, securing it at suitable points using cable ties.
4. Connect the cable to terminals -X2.
116
Module
Cabinet Modules
Manual, (GH5), 05/2010, A5E03263538A