EG2–84
ENGINE
–
ENGINE MECHANICAL
21. INSTALL NO.4 TIMING BELT COVER
Install the timing belt cover with the four bolts.
Torque: 8.3 N–m (85 kgf–em, 74 in.–Ibf)
22. INSTALL NO.2 AND NO.3 FUEL PIPES
(a) Install the No.2 fuel pipe with four new gaskets and
two union bolts.
Torque: 34 N–m (350 kgf–cm, 25 ft–lbf)
(b) Install the No.3 fuel pipe with four new gaskets and
two union bolts.
Torque: 34 N–m (350 kgf–cm, 25 ft–lbf)
23. INSTALL ENGINE WIRE
(a) Install the engine wire with the two bolts.
(b) Connect the following connectors:
Injector connectors
RH ground strap
ECT sender gauge connector
ECT sensor connector
No.2 ECT switch connector
Cold start injector time switch connector
Knock sensor connector
24. INSTALL AIR INTAKE CHAMBER
(a) Install a new gasket and the intake chamber with the
six bolts and two nuts. .
Torque: 18 N–m (185 kgf–cm, 13 ft–lbf)