Engine Reassembly - MOTO GUZZI Daytona RS Workshop Manual

Table of Contents

Advertisement

Available languages

Available languages

11.2

ENGINE REASSEMBLY

Before reassembling the engine, check all the
components carefully, as indicated in the
"CHECKING" chapter 11.4.
– To reassemble, carry out the dismantling operations
in reverse order, remembering the following:
– To avoid oil leaks from the 2 lower screws «A» -
Fig. 11-31, securing the rear engine shaft support
flange «B» - Fig. 11-31, bind these screws with
Teflon tape.
When fitting the flanges «B» and «C» - Fig. 11-32
on the crankcase, observe the assembly position
of the holes «D» and «E» - Fig. 11-32.
After having assembled the motor shaft in the base,
lock the caps coupling screws at Kgm 8,5÷9,3 torque.
WARNING
In consideration of the high load and stresses
these screws undergo, they must be replaced
with new ones.
NOTE: Apply some "FEL-PRO" lubricant on
the screw thread and on the laying surfaces.
IMPORTANT
In order to obtain a correct phasing of the system
be sure that the milled space «F» - Fig. 11-33 is
positioned on the opposite side of the phase
censor «G» - Fig. 11-33; then check with a
thickness gauge that the gap between the phase
censor and the teeth of the phonic wheel is
between 0.6 and 1.2mm.
78
D
C
D
F
B
A
11-31
E
B
E
11-32
G
11-33

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

V10 centauro1100 sportSport 1100Daytona rs

Table of Contents