Download Print this page

Adjustment Of Developer Unit - Toshiba e-STUDIO165 Service Manual

Hide thumbs Also See for e-STUDIO165:

Advertisement

3.9

Adjustment of Developer Unit

3.9.1
Doctor-to-sleeve gap
Adjustment tool to use: Doctor-sleeve jig
<Procedure>
(1)
Perform the adjustment code "05-280".
(2)
Take out the process unit from the equipment.
(3)
Take out the developer unit from the process unit.
(4)
Remove 2 screws and take off the developer
unit upper cover and discharge the devel-
oper material.
Note:
Note:
Discharge the developer material from the
rear side, being careful not to let it be scat-
tered on the gear.
(5)
Turn the adjustment screw to widen the gap
so that the jig can be inserted in it.
(Turning the screw clockwise widens the
gap)
e-STUDIO165/167/205/207/237
ADJUSTMENT
© 2006 - 2008 TOSHIBA TEC CORPORATION All rights reserved
3 - 44
Developer
unit upper cover
Fig. 3-31
Screw
Fig. 3-32

Hide quick links:

Advertisement

loading

This manual is also suitable for:

E-studio167E-studio205E-studio207E-studio237