Download Print this page

Preventive Maintenance Checklist - Toshiba e-STUDIO165 Service Manual

Hide thumbs Also See for e-STUDIO165:

Advertisement

4.3

Preventive Maintenance Checklist

Symbols used in the checklist
Cleaning
A: Clean with alcohol
B: Clean with soft pad,
cloth or vacuum
cleaner
[Preventive Maintenance checklist]
Notes:
1. Perform cleaning and lubricating in the following timing.
Exceptionally, the lubrication for the drum unit, main charger, developer unit and transfer unit
must follow the PM cycle of each unit.
e-STUDIO165/167:every 72,000 sheets
e-STUDIO205/207/237:every 90,000 sheets
2. Value under "Replacement" indicates the replacement cycle for e-STUDIO165/167/
e-STUDIO205/207/237.
3. The replacement cycle of the parts in the feeding section equals to the number of sheets fed
from each paper source.
4. Be careful not to put oil on the rollers, belts and belt pulleys when lubricating.
5. Page-Item (P-I) is described in the column of the Parts list.
A. Scanner
Items to check
A1
Original glass
A2
ADF original glass
A3
Carriage rail
A4
Original glass guide
A5
Automatic original
detection sensor
B. Laser unit
Items to check
B1
Slit glass
© 2006 - 2008 TOSHIBA TEC CORPORATION All rights reserved
Lubrication/Coating
L:
Launa 40
SI:
Silicon oil
W1:
White grease
(Molykote X5-6020)
W2:
White grease
(Molykote HP-300)
AV:
Alvania No.2
FL:
Floil (GE-334C)
Cleaning
Lubrication
(x 1,000 sheets)
B or A
B
B
B
B
Cleaning
Lubrication
(x 1,000 sheets)
B
4 - 3
07/02
Replacement
Value:
O: After cleaning or
Replacement
cycle
(Value x 1000)
R:Replace if
deformed or
damaged
Replacement
Operation
check
R
O
Replacement
Operation
check
PREVENTIVE MAINTENANCE (PM)
Operation check
replacement, confirm
there is no problem.
Parts list
Remarks
<P-I>
P17-I1
*a1
P17-I2
*a1
P9-I9
P9-I19
Parts list
Remarks
<P-I>
e-STUDIO165/167/205/207/237
4

Hide quick links:

Advertisement

loading

This manual is also suitable for:

E-studio167E-studio205E-studio207E-studio237