Final Inspection And Adjustment - Suzuki GSX-R750 Service Manual

Hide thumbs Also See for GSX-R750:
Table of Contents

Advertisement

SHOCK ABSORBER AND CUSHION LEVER MOUNTING
NUT
• Install the washers A and cushion lever.
! Cushion lever mounting nut: 78 N . m (7.8 kgf . m, 56.5 lb-ft)
!
!
!
!
• Assemble the cushion lever, cushion rod and rear shock ab-
sorber.
! Rear shock absorber mounting nut 1: 50 N . m
!
!
!
!
Cushion rod nut 2: 78 N . m (7.8 kgf . m, 56.5 lb-ft)
DRIVE CHAIN
• Connect the drive chain. ( 6-78)
TORQUE LINK
• Tighten the rear torque link nuts to the specified torque.
! Torque link nut (rear) 1: 34 N . m (3.4 kgf . m, 24.6 lb-ft)
!
!
!
!
• Route the brake hose and tighten the brake hose union bolt to
the specified torque. (Brake hose routing:  8-21, Brake
fluid replacement:  6-70)
! Brake hose union bolt: 23 N . m (2.3 kgf . m, 16.5 lb-ft)
!
!
!
!

FINAL INSPECTION AND ADJUSTMENT

After installing the rear suspension and wheel, the following ad-
justments are required before driving.
* Drive chain:  2-20
* Rear brake:  2-22
* Tire pressure:  2-25
* Chassis bolts and nuts:  2-28
(5.0 kgf . m, 36.0 lb-ft)
CHASSIS 6-59

Advertisement

Table of Contents
loading

Table of Contents