FNM HPEP 225 Installation Manual page 58

Table of Contents

Advertisement

FNM-HPE200
Installing Engine / Alignment
1. Attach a suitable chain sling to lifting eyes on engine and adjust so that engine is level
when suspended.
b
2. Lift engine into position (in boat) using an overhead hoist.
3. Align rear engine mounts with inner transom plate mounts while simultaneously aligning
exhaust pipe hose with exhaust tube and exhaust elbow. Do NOT relieve hoist tension.
a – Rear Lifting Eye
b – Front Lifting Eye
a – Engine Exhaust Pipe Hose
58
a
a

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpep 250

Table of Contents