Site Preparation
Site Preparation Checklist for EX2200 Switches
Table 17: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches you
want to install.
Rack or Cabinet
Copyright © 2011, Juniper Networks, Inc.
Site Preparation Checklist for EX2200 Switches on page 51
General Site Guidelines on page 52
Site Electrical Wiring Guidelines on page 53
Environmental Requirements and Specifications for EX Series Switches on page 54
The checklist in
Table 17 on page 51
preparing a site for EX2200 switch installation.
For More Information
"Environmental Requirements and
Specifications for EX Series Switches"
on page 54
"Power Specifications for EX2200
Switches" on page 65
"EX2200 Switches Hardware
Overview" on page 3
summarizes the tasks you need to perform when