Disassembly And Assembly Of Ink Supply Mechanism; C472_Sub-B Board - Epson Stylus Pro 7600 Service Manual

Color large format inkjet printer
Hide thumbs Also See for Stylus Pro 7600:
Table of Contents

Advertisement

EPSON Stylus Pro 7600/9600
4.5 Disassembly and Assembly of Ink Supply
Mechanism

4.5.1 C472_SUB-B Board

1.
Remove the L Side Cover. (p.163)
2.
Disconnect the seven FFCs (ink cartridge) and the two FFCs (Main Board/
Maintenance Tank) on the C472_SUB-B Board found at the left side of I/H Frame.
(See Figure 4-62)
3.
Disconnect the connector of the Release Sensor (I/H Lever).
4.
Remove the four screws (M3×6) and remove the C472_SUB-B Board.
When connecting an FFC, take great care not to insert it aslant.
C A U T I O N
(Inserting aslant can cause a short circuit of signals, thus resulting
in broken circuit elements.)
Disassembly & Assembly

Disassembly and Assembly of Ink Supply Mechanism

Release Sensor (I/H Lever)
FFC (Main Board)
Figure 4-62. Disconnecting the C472_SUB-B Board Connectors
Revision A
FFC (CSIC Relay Board) ×7
FFC (Maintenance Tank)
Screws (M3×6) ×4
192

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents